Our Trades

What goes on before the finish.

Every project stands on work you never see once it's finished — groundworks, structure, roofing, glazing and first fix, carried out by our own trades and long-standing subcontractors. Here's a look behind the scenes.

Groundworks & Drainage

Getting the foundations right

Excavation, drainage runs, soakaways and attenuation, and the concrete and steel that everything above ground relies on.

Excavator clearing the site ahead of foundation works Drainage trench being dug and pipework laid Reinforced slab and underfloor heating pipework ahead of the pour Concrete soakaway ring being installed Attenuation tank excavation and lining Attenuation tank excavation, wider view
Demolition & Strip-Out

Back to brick, before we rebuild

On refurbishment projects, a full strip-out gives us an honest look at the existing structure before reconfiguration begins.

Stairwell stripped back to bare walls during refurbishment Interior fully stripped out, exposing existing pipework and structure
Structure, Steel & Scaffolding

Getting the frame up

Structural steel, blockwork and timber frame, craned and pieced into place under full scaffold access.

Structural steelwork being lifted into place under scaffold Mobile crane lifting structural elements over the roofline Compact spider crane on site for tight-access lifting Blockwork and roof frame going up under scaffold Structural build progressing under full scaffold access
Roof Structure

Roofing, done properly

Timber roof structures cut and assembled on site, felted and battened ready for tiling or slate.

Close-up of roof felt and timber rafters Roof timbers being assembled from scaffold Roof structure taking shape against the sky
Windows & Doors

Glazing that opens a home up

Large-format glazing and bifold doors, fitted with the precision that a heavy sliding or folding door demands.

Large bifold door glazing being fitted into an extension
Flooring, Tiling & Second Fix

The final trades before handover

Flooring, tiling, sanitaryware and fittings — the last trades on site before a room is ready to live in.

Timber flooring being laid in an open-plan kitchen Fully tiled bathroom nearing completion Sanitaryware fitted during second fix
Landscaping & External Works

Finishing the outside, too

Patios, paths and garden landscaping carried out as part of the same programme — so the outside is finished to the same standard as the inside.

Patio construction in progress with materials laid out Garden graded and prepared for landscaping
Bespoke Joinery

Plus everything our own joiners build in-house

Kitchens, bathrooms and fitted joinery are designed and produced by our own team — see the finished results on the Craftsmanship page.

View Craftsmanship

Want the same standard on your project?

Every trade on site is managed to the same standard, from groundworks to the final coat of paint.

Start a Conversation